|
Showcase Projects
Metro Redline Station
Los Angeles, California
Owner: |
Metro Transit Authority |
Architect: |
DMJM/PBQD/DE/HWA,J.V. |
Engineer: |
E.M.C. |
Construction Manager: |
Parsons-Dillingham |
General Contractor: |
Tutor-Saliba-Perini |
Project Duration: |
15 Months |
Contract Amount: |
$1,100,000 |

Project Description:
The Metro Redline, B211 Wilshire/Vermont Station consists of an impressive three-story underground station, 120 feet deep and 600 feet long. The Vermont Station is the transfer/junction point for the Wilshire Corridor and the Hollywood line. Dynalectric did the embedded conduit in this phased construction project.
Back
to top
|
 |