Campus at Playa Vista, LOS ANGELES, CA

LEED Electrical Solutions

DYNALECTRIC L.A. VALUE DELIVERED

A new addition to the client’s real estate portfolio; expert delivery of complex electrical systems; optimum energy efficiency; low operating costs; modern exterior and garage lighting for greater security; leading-edge life safety systems; minimized environmental impact; efficient and responsive building management; LEED (Leadership in Energy and Environmental Design) silver certification, revenue enhancement.

ELECTRICAL SERVICES OBJECTIVES

To build a multi-use community that is energy efficient and environmentally responsible.

ELECTRICAL SOLUTIONS

To complete this LEED (Leadership in Energy and Environmental Design) silver project consisting of three five-level facilities – two offices and one garage/parking structure, Dynalectric L.A. provided a complete “core-and-shell” electrical installation on both a design-build and design-assist basis.

The design-build component included the fire alarm system, as well as a LEED/California Title 24-compliant lighting control system. Using both motion and infrared sensors, this system enhances energy efficiency by turning lights off in unoccupied public and other areas. To maximize system integration, Dynalectric L.A. connected the system to the client’s proprietary building management system.

The design-assist scope of work consisted of a complete electrical system. This required bringing power from three electrical transformers to the buildings’ main distribution panels. From there, the company ran conduit and wire to branch panels, which provided power for light fixtures, receptacles and other devices. The company also installed site lighting and lighting for the facility’s underground parking structure. In addition, because of methane, a dangerous natural gas found in the ground around the facility, the company installed methane barrier switchgear with automatic seal offs that prevent the gas from escaping and harming the environment.

BACKGROUND

Playa Vista is the first new community to be established on the Westside of Los Angeles in more than 50 years. The community features residential, commercial, retail and open space, creating a place to live, work, shop and play. Situated about a mile from the ocean, Playa Vista is nestled below the bluffs of Westchester, adjacent to the newly restored Ballona Freshwater Marsh and within easy reach of Santa Monica, Venice, Century City and Los Angeles.

COMMERCIAL

OFFICE BUILDINGS/REAL ESTATE

 

 

OPERATING COMPANY:
Dynalectric L.A.

CLIENT:
Lincoln Property Company

ENGINEER:
M-E Engineers

ARCHITECT:
HKS Architects, Inc.

GENERAL CONTRACTOR:
Morley Construction

ELECTRICAL CONTRACTOR:
Dynalectric L.A.

PROJECT DURATION:
Approximately two years

 

 

 

New Construction
Retrofit
Electrical Services
Electrical Construction
Mechanical Construction
Facilities Services
Consulting Services
Energy Services

Projects

  • Commercial
    • Amgen Building
    • Bank of America Data Center
    • California Science Center
    • Caltrans District 7 Headquarters
    • Campus at Playa Vista
    • Equinix Los Angels
    • ESPN Studios
    • Getty Villa
    • Northrop Critical Power Supply
    • Orange County Water District
    • U.S. Food & Drug Administration
  • Education
    • Beverly Hills High School
    • California State University Fullerton Fine Arts
    • Colburn School of Performing Arts
    • El Camino Community College
    • Harvard-Westlake Middle School Modernization
    • The Richard C. Seaver Biology Building
    • West Los Angeles College
  • Entertainment / Hospitality
    • Long Beach Arena / Convention Center
    • Hollywood Bowl
    • Andaz
  • Hotels
    • Four Seasons Hotel
    • Hollywood Renaissance
  • Industrial
    • Hyperion C-741
    • Hyperion-Dice I
    • Pier 400 Backland Phase 1
    • Pier T
    • Port of Los Angeles AMP Berths 91-93
    • Port of Los Angeles Berths
  • Institutional
    • Central Jail
    • Los Angeles Convention Center
    • Oakland Arena
    • Oakland Coliseum
  • Medical / Healthcare
    • Century City Doctors Hospital
    • Kaiser Ontario Vineyard Medical Center & ASC Building
    • Little Company of Mary Hospital
    • Miller Children's Hospital Addition and Central Utility Plant
    • Rancho Los Amigos Facility Operations
    • Rancho Los Amigos Hospital
    • UCLA Santa Monica Orthopedic Hospital
  • Parking Facilities
    • John Wayne Airport Parking
    • West Los Angeles College Parking
  • Public / Government
    • Jet Propulsion Laboratory Flight Projects Center
    • Pasadena City Hall
  • Transportation
    • Alameda Corridor East
    • Caltrans
    • City of Beverly Hills Phase II Street Lighting Improvements
    • City of Santa Monica Street & Park Lighting
    • Denver I-25
    • Exposition Park A.T.S.A.C. Adaptive Control System
    • Gold Line Authority
    • Golden State Freeway A.T.S.A.C.
    • Highland A.T.S.A.C.
    • Honolulu International Airport
    • Metro Redline Station
    • Metro Redline Station B221
    • Metro Redline Tunnels B251 B, C and D
    • Metro Redline Tunnels B251 E and F
    • Ronald Reagan Freeway
    • Caltrans Rte. 215 Fwy and Rte. 91 Fwy
    • San Joaquin Hills Transportation Center
    • Sepulveda Corridor A.T.S.A.C.
    • St. Paul International Airport
    • Westchester A.T.S.A.C.
  • Biotech / Healthcare
    • Arrowhead Regional Medical Center
    • Hoag Memorial Hospital Presbyterian
    • Miller Children's Hospital
 

Dynalectric L.A.

  • About
  • Services
  • Projects
  • Contact
  •  

EMCOR Group, Inc. 

  • About Us
  • Locations
  • Investor Relations
  • Corporate Social Responsibility
©2021 EMCOR Group Inc.

Privacy Policy | Sitemap

NYSE: EME