Metro Redline Station, Los Angeles, California
Electrical Construction Services
Owner
Metro Transit Authority
Architect
DMJM/PBQD/DE/HWA,J.V.
Engineer
E.M.C.
Construction Manager
Parsons-Dillingham
General Contractor
Tutor-Saliba-Perini
Project Duration
15 months
Electrical Services Project Description:
The Metro Redline, B211 Wilshire/Vermont Station consists of an impressive three-story underground station, 120 feet deep and 600 feet long. The Vermont Station is the transfer/junction point for the Wilshire Corridor and the Hollywood line. Dynalectric L.A. did the embedded conduit in this phased commercial electrical construction project.